Geotextile and Leveling

Flood Test

After the UV covering has dried (min 24 hours) flood test is led with a water profundity of 5-6 cm for 48 hours to guarantee no leakage is available in the framework. When the UV covering is totally dried, Our Engineer will visit the site to examine the works finished and give clearness for a flood test (at least 24 hours).